Narowal Energy Limited
HUBCO is the only IPP to go into expansion and has set up a 225 MW power plant at Mouza Poong, Narowal, Punjab. Spread over 62 acres of land, located 150 km northeast of Lahore, the Narowal Power Plant was constructed in 2010. It is also an RFO-fired, engine based, combined cycle power station.
The plant comprises of 11 generating sets based on MAN 18v48/60 engine, 11 Alborg Heat Recovery Steam Generators and one air cooled condensing Steam Turbine from Dresser Rand. The engines are four-stroke, medium speed, turbo charged and charge air cooled. Each engine has a generating capacity of 18.428 MWe while the designed output of the steam turbine is 16.45 MWe. These engines are capable of operating as base load plant on RFO. Generation capacity of these engines and steam turbo generator, at ISO conditions, is 225 MWe Nett with an average efficiency of 45% in combined cycle mode.
Vision
Fueling lives through energy.
Vision & Mission
To be a growth-oriented company recognized for international standards in safety and environment in providing reliable and affordable energy; serving the country, its stakeholders and local community as a responsible corporate citizen.
Company Registration Number
0095984
Date of registration
November 03, 2015
National Tax Number
7282966-4
Registered office address
9th Floor, Ocean Tower, G-3, Block 9, Main Clifton Road, Karachi
Head office address
9th Floor, Ocean Tower, G-3, Block 9, Main Clifton Road, Karachi
Branch office addresses
9th Floor, Ocean Tower, G-3, Block 9, Main Clifton Road, Karachi
Valid email address
secretarial@hubpower.com
Board of Directors
1. Muhammad Kamran Kamal - Chairman and Chief Executive Officer
2. Aly Khan - Director
3. Amjad Ali Raja - Director
4. Jawwad Ahmed Shakir - Director
Shareholding Pattern